GO Train on Lakeshore near Sunnyside passing signs for Metrolinx and Bombardier.

(Raysonho @ Open Grid Scheduler / Scalable Grid Engine, CC0, via Wikimedia Commons)

 

Metrolinx

Metrolinx is a transportation agency in Ontario, Canada. It is a Crown agency that manages and integrates road and public transportation in the Greater Toronto and Hamilton Area (GTHA). It was created as the Greater Toronto Transportation Authority on June 22, 2006, and adopted its present name as a brand name in 2007 and eventually as the legal name in 2009. It is headquartered at Union Station in Toronto.

Metrolinx serves as the central procurement agency on behalf of Ontario municipalities for local transit vehicles, equipment and services. It is also responsible for operating the GO Transit system, the Presto card used across the GTHA and by OC Transpo in Ottawa and the Union Pearson Express airport rail link to Toronto Pearson International Airport.

Metrolinx is also responsible for the construction of transit expansion projects worth nearly $30 billion in Toronto – including Line 5 Eglinton, the Ontario Line, the Line 1 subway extension into Richmond Hill in York Region, and the Line 2 extension – following a 2020 agreement with the City of Toronto.

 

Metrolinx logo on a GO Train at the Barrie South GO station.

(Raysonho @ Open Grid Scheduler / Scalable Grid Engine, CC0, via Wikimedia Commons)

 

History

The Greater Toronto Transportation Authority was created by legislation and introduced in the Legislative Assembly of Ontario on April 24, 2006. The bill was passed and received royal assent on June 22, 2006. In April 2007, a transition team seconded from the Ontario Public Service began work at the GTTA's headquarters at 20 Bay Street in Toronto.

On December 4, 2007, the GTTA adopted the name 'Metrolinx' for public use. At the same time, it launched a new web site, and released the first of its series of green papers on transportation issues, part of the process of creating the Regional Transportation Plan. From June 2008, Metrolinx began using a new logo in printed and electronic communications.

 

Timeline

2008:

  • December 17: Metrolinx announced that, together with twelve municipalities, it had made a collective bus purchase for 160 buses.

2009:

  • March 30: the Ontario government introduced legislation to merge GO Transit and Metrolinx into a single entity, with "Metrolinx" as its legal name. The legislation received royal assent on May 14, 2009, taking immediate effect. This resulted in the replacement of the previous board structure with a new one in which 15 private-sector appointees are made by the province. The legislation makes other changes to Metrolinx's powers and abilities. GO's trackage used to be owned entirely by Canada's two major commercial railways: the large majority by the Canadian National Railway (CNR) and the remainder by Canadian Pacific Railway (CPR). Before Metrolinx's creation, GO Transit had only acquired partial ownership of the Lakeshore East, Barrie, Stouffville and Milton lines. However, ever since its inception Metrolinx has been expanding its ownership of the rail corridors on which GO Transit operates by acquiring nonessential rail lines from both CN and CP.
  • April 8: Metrolinx announced that it had acquired the Weston Subdivision, part of the Kitchener line, then known as the Georgetown line, for $160 million from CN.
  • June 27: GO Transit introduced summer weekend GO train service between Toronto and Niagara Falls.
  • December 15: Metrolinx announced that it had acquired the lower portion of the Newmarket subdivision for $68 million from CN, giving it full ownership of the Barrie line.

2010:

  • March 31: Metrolinx announced that it had acquired a key piece of track from CN for $168 million. This purchase was for a portion of the Oakville subdivision from Union station to 30th Street in Etobicoke just west of GO's Willowbrook Rail Maintenance Facility.
    July 30: Metrolinx announced its plan to build, own and operate the air rail link between Union Station and Toronto Pearson International Airport.

2011:

  • January 24: Metrolinx and the Regional Municipality of York awarded contracts for early construction on work on the York Viva Bus Rapid Transit way.
  • March 30: Metrolinx announced that it had acquired the portion of the Kingston line on which that GO trains operate from CN for $299 million, giving them full ownership of the Lakeshore East line.
  • June 16: Metrolinx announced that, together with 12 municipalities, it purchased 287 new transit buses.
  • August 24: Metrolinx division GO Transit announced that the Presto card was available across its entire GTHA network.
  • December 19: GO Transit expanded its weekday GO train service to include stations in Kitchener-Waterloo and Guelph.

2012:

  • January 29: Metrolinx division GO Transit opened the new Allandale Waterfront GO Station in Barrie.
  • March 27: Metrolinx announced that it had acquired key portions of multiple subdivisions from CN for $310.5 million. This purchase included the southern portions of the Bala subdivision up to CN's main east-west freight line the York subdivision, part of the Richmond Hill line and a large portion of the Oakville subdivision from 30th Street in Etobicoke to a point just west of Fourth line in Oakville.
  • May 10: GO Transit announced summer weekend and GO train service between Toronto and Barrie.
  • November 15: GO Transit launched the GO Train Service Guarantee, a fare credit policy for train delays.
  • November 29: Metrolinx announced the Next Wave of Big Move projects.

2013:

  • January 5: GO Transit began serving the new Acton GO Station.
  • March 22:, Metrolinx completed an additional purchase of the Oakville subdivision from CN for $52.5 million. This purchase was for the portion from Fourth Line in Oakville to a point just east of where CN's freight main line joins the Oakville Subdivision in Burlington.
  • April 13: Presto's smart farecard is available across the entire OC Transpo network in Ottawa.
  • May 27, 2013, Metrolinx announced its Investment Strategy, a series of recommendations for sustaining transit growth in the region.
  • June: Metrolinx had ownership of 68% of the corridors on which it operates, up from 6% in 1998. It has complete ownership of the Barrie, Stouffville and Lakeshore East lines and majority ownership of the Lakeshore West line (to a point just west of Burlington GO station) and Richmond Hill line (to Doncaster Junction, a point in between Old Cummer and Langstaff GO stations). Metrolinx owns comparatively small portions of the Kitchener and Milton lines, a situation that is unlikely to change as the lines are heavily used by freight traffic.
  • June 5: Metrolinx crews began tunnelling the western underground portion of the Eglinton Crosstown light rail transit line.
  • June 28: GO Transit introduced its biggest expansion in 46 years with 30-minute service on the Lakeshore lines.
  • November 29: Metrolinx opened the Strachan Avenue underpass, allowing GO trains to operate below the road without disrupting road traffic. Metrolinx and the City of Mississauga announced the start of construction for the west segment of the Mississauga Transitway, scheduled for completion in 2016.

2014:

  • February 28: Metrolinx revealed plans to increase train service to Hamilton and build the new West Harbour GO Station.
  • March 31: Metrolinx division Presto announced that one million transit riders were using the electronic fare card across the GTHA and Ottawa.
  • July 17: it was reported that Metrolinx had purchased stations at Georgetown, Brampton and Oshawa.
  • September 24: Metrolinx announced the purchase of the segment of the Kitchener line between Kitchener and Georgetown.
  • September 30: Metrolinx announced a partnership with Ivanhoé Cambridge to redevelop a new GO Bus Terminal that serves as a major transit, commercial and community hub.

2015:

  • February 2: 36 GO stations and terminals began offering free WiFi, providing coverage to approximately 80 per cent of customers.
  • February 12: Metrolinx announced a major expansion of Stouffville GO Line, adding additional tracks and improving the corridor to increase train.
  • March 10: Metrolinx announced a major expansion of Barrie GO line, adding additional tracks and improving the corridor to increase train capacity.
  • April 24: the new York GO Concourse was opened, a major part of the ongoing revitalization of Union Station, adding 50 per cent more capacity than the Bay Concourse.
  • June 6: the new Union-Pearson Express was launched, linking Toronto's Pearson International Airport with Union Station via a 25-minute two-stop express train.
  • July 9: the new West Harbour GO Station was opened in Hamilton, in time for the Toronto 2015 Pan Am Games.

2018:

  • January: Metrolinx claimed that their computer systems were hacked by North Korea, but did not provide any further details.
  • March 14: the Whitby Rail Maintenance Facility was substantially completed.

 

Responsibilities

The Metrolinx Act, 2006, formerly known as the Greater Toronto Transportation Authority Act, 2006, describes two of Metrolinx's primary responsibilities as being:

to provide leadership in the co-ordination, planning, financing and development of an integrated, multi-modal transportation network that conforms with transportation policies of growth plans prepared and approved under the Places to Grow Act, 2005 applicable in the regional transportation area and complies with other provincial transportation policies and plans applicable in the regional transportation area, and
to act as the central procurement agency for the procurement of local transit system vehicles, equipment, technologies and facilities and related supplies and services on behalf of Ontario municipalities.

 

The Big Move regional transportation plan

The Big Move: Transforming Transportation in the Greater Toronto and Hamilton Area was one of Metrolinx's first deliverables. It is a Regional Transportation Plan (RTP) including a rolling five-year capital plan and Investment Strategy for the GTHA. The plan builds on 52 GO train, subway, light rail and bus rapid transit projects proposed by the Government of Ontario in its MoveOntario 2020 plan announced on June 15, 2007, and includes new projects to support them.

A draft version of the Big Move was provided to Metrolinx on September 26, 2008, and a final version was approved on November 27, 2008.

Progress
Planning and construction is underway for some projects supporting the Regional Transportation Plan.

The three levels of government have provided $16 billion toward the first wave of projects, which are already underway. The next wave of projects were still in the planning phase at the time of the Big Move's release, and still subject to funding. Some of these projects have since attained approved funding, while others have not.

 

Funding investment strategy

The Metrolinx Investment Strategy, released in May 2013, proposes a series of 24 recommendations as part of a four-part plan to integrate transportation, growth and land use planning in the GTHA, maximize the value of public infrastructure investment, optimize system and network efficiencies, and dedicate new revenue sources for transit and transportation. These recommendations included revenue tools and policy recommendations.

Metrolinx also advised that funds raised by all the new taxes would be put in a dedicated transportation trust fund, one that would be administered by a board separate from Metrolinx.

The Investment Strategy was given to the government for consideration in 2013.

 

Current projects

As of May 2024, Metrolinx is managing the following public transit projects:

Commuter rail

Type Transit service Project Start End Description
GO Expansion Barrie line Aurora GO Station August 21, 2023 Second track to allow two-way train service to Aurora GO. Construction of second platform.
GO Expansion Barrie line Bloor–Lansdowne GO Station February 2024 November 2027 SmartTrack station.
GO Expansion Barrie line Bradford GO Station[54]
GO Expansion Barrie line King City GO Station Surface parking expansion and renovations. New railway platform. Pedestrian bridge.
GO Expansion Barrie line Maple GO Station Renovated and upgraded railway platforms. Pedestrian tunnels under platforms. Expanded bus loop with tunnel connection.
GO Expansion Barrie line Rutherford GO Station July 11, 2022 Upgraded bus loop.
GO Expansion Barrie line Corridor Improvements Davenport Diamond Grade Separation. Second set of tracks up to Aurora GO station. Electrification.
GO Expansion Kitchener line Bramalea GO Station 2020 May 15, 2023 New station building. New parking lot.
GO Expansion Kitchener line King–Liberty GO Station January 2024 March 2028 SmartTrack station.
GO Expansion Kitchener line St. Clair–Old Weston GO Station January 2024 Dec 2028 SmartTrack station.
GO Expansion Kitchener line Weston GO Station 2019 New railway platform. New track through station limits.
GO Expansion Kitchener line Corridor Improvements Railway tunnels under Ontario Highway 401 and Ontario Highway 409. Additional railway track. Electrification.
GO Expansion Kitchener line Kitchener Extension May 2022 Second platform at Guelph Central GO Station. New storage and passing tracks.
GO Expansion Kitchener line Bloor GO Station Underground pedestrian tunnel connecting Bloor GO/UP station with Dundas West.
GO Expansion Lakeshore East line Bowmanville Extension Extension of Lakeshore East line from Oshawa GO Station to Bowmanville.
GO Expansion Lakeshore East line East Harbour Transit Hub November 2022 August 2028 SmartTrack station.
GO Expansion Lakeshore East line Eglinton GO Station Sep 24, 2022 Late 2024 Four new elevators to bring station into compliance with Accessibility for Ontarians with Disabilities Act, 2005.
GO Expansion Lakeshore East line Corridor Improvements Grade separation. Maintenance and storage facilities (Whitby Rail Maintenance Facility, completed 2018). Train layover facilities - Don Valley and Midland layover. Additional track. Electrification.
GO Expansion Lakeshore West line Confederation GO Station October 11, 2022 2025 New train station in Hamilton.
GO Expansion Lakeshore West line Long Branch GO Station December 2023 New entrance building and new tunnels for platform access.
GO Expansion Lakeshore West line Mimico GO Station 2022 Accessible routes to all platforms.
GO Expansion Lakeshore West line Niagara Extension Proposed GO station in Beamsville, Ontario.
GO Expansion Lakeshore West line Corridor Improvements Burloak Drive Grade Separation. Drury Lane Pedestrian Bridge. Electrification.
GO Expansion Milton line Cooksville GO Station November 2, 2017 Sep 3, 2022 New station building.
GO Expansion Milton line Kipling Bus Terminal April 13, 2018 May 20, 2021 New bus terminal for GO Transit and MiWay.
GO Expansion Richmond Hill line Bloomington GO Station Sprint 2017 June 28, 2021 New train station.
GO Expansion Stouffville line Agincourt GO Station May 7, 2018 Sep 21, 2023 New station building. Second platform. Second track.
GO Expansion Stouffville line Finch–Kennedy GO Station October 2023 August 2027 SmartTrack station.
GO Expansion Stouffville line Milliken GO Station 2019 Sep 2023 New second track.
GO Expansion Stouffville line Old Elm GO Station October 27, 2023 Rebuilt train station. Bus loop.
GO Expansion Stouffville line Unionville GO Station May 31, 2022 286 new parking spots. New island platform. Second track and turnaround track.
GO Expansion Stouffville line Corridor Improvements Grade separation. Steeles Avenue East underpass. Second track between. Kennedy GO and Unionville GO. Electrification.
GO Expansion Union Station Union Station Enhancement Project
GO Expansion Union Station Wilson Yard expansion
GO Expansion Union Station Signalling system upgrade
GO Expansion Union Station Track enhancements

Rapid transit

Type Transit service Project Start End Description
Bus rapid transit Dundas Street bus rapid transit Expected: GO Transit, TTC, MiWay, Oakville Transit, Burlington Transit, Hamilton Street Railway 48 km (30 mi) bus rapid transit (BRT) corridor between Kipling Bus Terminal and Ontario Highway 6 in Hamilton
Bus rapid transit Durham–Scarborough bus rapid transit Expected: TTC, Durham Region Transit and GO Transit 36 km (22 mi) BRT corridor through Oshawa, Whitby, Ajax, Pickering and Scarborough
Bus rapid transit Queen Street – Highway 7 Bus Transit
Light rail Line 5 Eglinton 2011 Not announced 19 km (12 mi), 25-stop light rail along Eglinton Avenue between Mount Dennis station and Kennedy station
Light rail Line 6 Finch West 2016 Not announced 10.3 km (6.4 mi), 18-stop light rail along Finch Avenue West from Finch West station to Humber College station
Light rail Hamilton LRT
Light rail Hazel McCallion LRT 2020 Not announced 18 km (11 mi), 19-stop light rail along Hurontario Street between Brampton Gateway Terminal and Port Credit GO Station
Subway Line 5 Eglinton westward extension July 2021 9.2 km (5.7 mi) extension of Line 5 Eglinton from Mount Dennis station to Renforth station
Subway Ontario Line March 27, 2022 2031 15.6 km (9.7 mi), 15-stop subway between Exhibition GO Station and Science Centre station
Subway Scarborough subway extension November 30, 2022 7.2 km (4.5 mi), 3-stop extension of Line 2 from Kennedy to Sheppard Avenue
Subway Yonge North subway extension 8 km (5.0 mi), 5-stop extension of Line 1 from Finch station to future High Tech station

Operating divisions

GO Transit offers train and bus service across the GTHA.

(Taxiarchos228, Danielle Scott, Daniel Hsia, CC BY-SA 3.0 <https://creativecommons.org/licenses/by-sa/3.0>, via Wikimedia Commons)

 

GO Transit

Main article: GO Transit
GO Transit is the inter-regional public transit system serving the Greater Toronto and Hamilton Area and the Greater Golden Horseshoe. GO carries over 65 million passengers a year using an extensive network of train and bus services; rail service is provided by diesel locomotives pulling trains of unpowered double-deck passenger cars, while most bus service is provided by inter-city coaches.

Canada's first such public system, GO Transit began regular passenger service on May 23, 1967, under the auspices of the Ontario Ministry of Transportation. Over time it has been constituted in a variety of public-sector configurations, but it became an operating division of Metrolinx in 2009.

New and improved GO service is a top transit priority listed in the regional transportation plan. Since 2009, GO Transit has introduced seasonal train service to Barrie and Niagara Falls, extended service to Kitchener and Lake Simcoe, opened four new stations at Acton, Guelph Central, Allandale Waterfront, and Hamilton West Harbour. Since June 2013, GO Trains along the Lakeshore rail lines run every 30 minutes, making the biggest expansion in GO Transit history.

 

A Metrolinx Union Pearson Express train at Toronto Union Station.

(Christopher Steffan Charabaruk, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons)

 

Union Pearson Express

Main article: Union Pearson Express
The Union Pearson Express (UP Express) airport rail link service began operation on June 6, 2015, linking Union Station in downtown Toronto with Pearson International Airport in the city of Mississauga, roughly 23.3 km (14.5 mi) away. The trains run every fifteen minutes, seven days a week, and are predicted to eliminate 1.5 million car trips annually. The duration of this trip is approximately 25 minutes.

The line uses a Metrolinx-owned railway rail corridor now used by GO Transit, as part of the Georgetown South Project to allow for additional train traffic. The UP Express shares the same path as trains on the Kitchener line, before splitting off onto a separate subdivision just west of the Etobicoke North Station. It stops at the existing Bloor and Weston GO Stations.

 

The Presto card allows seamless fare payment between different public transit agencies.

(Metrolinx, Public domain, via Wikimedia Commons)

 

Presto

The Presto card, originally known as the GTA Farecard, is a smartcard-based fare payment system for public transit systems in Ontario, including those in the Greater Toronto and Hamilton Area and Ottawa. The Presto system is designed to support the use of one common farecard for fare payment on various public transit systems, through electronic readers that calculate the correct fare and deduct it from a preloaded balance.

Presto will also centralize its operational logistics, such as farecard procurement, reporting services, and a customer call centre. The system was trialled from June 25, 2007, to September 30, 2008. Full implementation began in November 2009. It will be rolled out across the province in stages. Presto now serves over a million customers in the GTHA and Ottawa.

By January 2017, Presto had been fully implemented on the following 11 transit systems:

  • Brampton Transit
  • Burlington Transit
  • Durham Region Transit
  • GO Transit
  • Hamilton Street Railway
  • MiWay
  • Oakville Transit
  • OC Transpo
  • Toronto Transit Commission
  • UP Express
  • York Region Transit

 

A Presto card reader in a Toronto Transit Commission bus.

(Fabian Roudra Baroi, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons)

 

Other programs

Smart Commute is a program that, with the support of local municipalities, endeavours to fight climate change by reducing traffic congestion and increasing transit efficiency. Employers and employees in the GTHA can explore and have assistance with different commuting options, such as carpooling, transit, cycling, walking, remote work, and flextime. The program is delivered through local transportation management associations.

Originally conducted under the Ontario Ministry of Transportation in 2006, the Transit Procurement Initiative involves Metrolinx assisting municipal transit operators with the procurement of vehicles, equipment, technologies, facilities and related supplies. The goal of the program is to reduce per unit cost, increase unit quality, and provide an open and transparent procurement process for municipal transit operators. To date, the program has supported 21 municipalities and transit agencies, has purchased over 400 buses, and has saved an estimated $5 million.

Metrolinx also seeks partnerships with individuals and the community, and offers financial support for proposed projects that support transit.

Smart Commute includes various programs for commuters, including carpool ride-matching, walking and cycling, and teleworking programs.

In July 2015, a $4.9 million plan was announced to double the size of Bike Share Toronto by 2016. The bicycles and docking stations will be owned by Metrolinx, while the system will continue to be operated by the Toronto Parking Authority.

In 2021, Metrolinx dropped its hydrail program.

 

Criticism

Metrolinx has been criticized for not having enough executive power in planning transit outside of municipal politics, despite being established to take political delay out of transportation planning. After Rob Ford was elected mayor of Toronto in December 2010, he declared Transit City, the provincially funded transit expansion plan of light rail lines, dead. These lines were a large component of Metrolinx's 2008 Big Move. Metrolinx was again criticized when, in January 2012, its CEO declared that it would bend to what Toronto City Council wanted regarding how the Eglinton-Scarborough Crosstown LRT line should be built. The issue centred on whether the more suburban stretches of the line, from Laird Drive to Kennedy Station, should be built at street level instead of a more costly underground alignment. Metrolinx was criticized after a Toronto Star investigation found that the agency has approved two transit stations, Kirby and Lawrence East, for the GO Regional Express Rail expansion due to political pressure from the Ministry of Transportation. Kirby is in the Vaughan riding of the then-transportation minister, Steven Del Duca, and Lawrence East in Scarborough is part of Toronto mayor John Tory's "SmartTrack" plan, his signature campaign promise. Both stations were not recommended to be constructed in the near term by an external consultant, AECOM, hired by Metrolinx. However, they were both shortlisted to begin construction. Ontario's auditor general found that Metrolinx incurred about $436 million "in sunk and additional" – unrecoverable – costs between 2009 and 2018 due to numerous changes in transit plans.

In Ottawa, where Metrolinx is only involved in fare collection, Jim Watson, the former mayor of Ottawa, has criticized Metrolinx for wanting to increase the fee it collects from 2% to 10%, and characterized it as a monopoly.

 

Governance

Metrolinx used to be governed by a board consisting of various appointees from the Ontario government and the regions within the GTHA. After the passage of the Greater Toronto and Hamilton Area Transit Implementation Act, 2009 merging Metrolinx and GO Transit, the Metrolinx board structure was changed, with politicians specifically prohibited from serving.

The Metrolinx president and CEO is Phil Verster, who also serves as a member of the board of directors. Verster resigned on December 2, 2024, and will be replaced by interim president and CEO Michael Lindsay.

Metrolinx's board of directors is composed of not more than 15 persons (including the CEO) appointed by the Ontario's lieutenant governor on the recommendation of the Ontario Minister of Transportation. As of January 2018, the chair was Donald Wright.

 

List of Metrolinx presidents and CEOs

President and CEO From Until Note
Robert MacIsaac 2006 2009 Chair
Robert Prichard 2009 September 2010
Bruce McCuaig September 2010 April 2017
John Jensen April 2017 September 2017 Interim CEO
Phil Verster October 2017 December 2024
Michael Lindsay December 2024 (incumbent) Interim CEO

Agency overview

Formed: June 22, 2006 (as the Greater Toronto Transportation Authority)
Type: Crown agency
Jurisdiction: Government of Ontario
Headquarters: Union Station, 97 Front Street West, Toronto, Ontario, Canada
Agency executives:
Donald Wright, chair
Michael Lindsay, interim president and CEO
Child agencies:
GO Transit
Union Pearson Express
Presto
Key document: Metrolinx Act, 2006 (SO 2006, c. 16)
Website: www.metrolinx.com